Carver Greenfield, Sludge Dehydration/Cogen
Carson, CA
 
“The interior fireproofing required reaching a 110 foot high ceiling by using rigging, swing stage, and spider baskets to get around piping and process systems. We were very concerned with safety as well as schedule. Once Clayton started this work, we knew we hired the right contractor. Clayton finished the entire project ahead of schedule and without a single accident.”
 
James P. McCallion, Project Manager

Industrial7

Clayton provided the site wide high density fireproofing, sandblasting, coatings, tank linings, and fireproof shaft liners for this complexly engineered power plant. This $8 Million dollar multi-discipline contract required integrated scheduling and logistics to perform all the work within the schedule and accident free.