Champlin Oil/ MC Carbon
Wilmington, CA
 
"Double Shifts were used to complete the site wide industrial coatings and fireproofing simultaneously. Clayton finished these critical path items 58 days ahead of schedule."
 
 

Industrial3

Clayton provided the urethane and epoxy coatings over a #10 blast on the entire grass roots coke calcination plant. Additionally, Clayton utilized an epoxy based Intumescent fireproofing materials for all areas requiring fire resistance. Double shifts were used to complete the fireproofing and industrial coatings simultaneously, finishing this $1.9 Million contract 58 days ahead of schedule.