Private Client Fab 23
Colorado Springs, CO
 
“Clayton mobilized the project quickly supporting our needs on schedule. Since the building shell already existed, it was imperative to the success of the schedule. Clayton came through.”
 
Will Hopkins, DPR Construction

HighTech3

A 100,000 SF Class 1 Cleanroom in an existing building. A fast-paced project, which required immediate mobilization. Clayton installed the Intumescent fireproofing materials with high level of smoothness in the clean room. The $3.1 Million fireproofing contract was completed in 6 weeks.