Micron Technologies-Fab 5
Lehi, UT
 
“As part of a billion dollar project, we were responsible for a $432-million fab building that was to be built in record time. We selected Clayton because of their track record on tough projects. They performed flawlessly.”
 
Will Hopkins, Big-D Construction

HighTech5

The $8 Million contract to Clayton included interior and exterior intumescent fireproofing, metal fiber board fireproofing on metal deck and exclusive plural-component epoxy top coating on massive surfaces.